Essential Viewing TVI C300 Guida di Installazione Pagina 1

Navigare online o scaricare Guida di Installazione per Server Essential Viewing TVI C300. Essential Viewing TVI C300 Installation guide Manuale Utente

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 12
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 0
Installation Guide
Network Encoder Model TVI C300
Vedere la pagina 0
1 2 3 4 5 6 ... 11 12

Sommario

Pagina 1 - Installation Guide

Installation GuideNetwork Encoder Model TVI C300

Pagina 2 - Hardware Overview

Fault ChecklistAfter 30-90 seconds (depending on the communications device) the Network Encoder should befully powered and connected to the Network Se

Pagina 3 - Installing the TVI Encoder

I/O Terminal (RS485/422/Alarm/DC): Provides RS485/422 data connections, an alarm inputconnection and an additional DC power input.Figure 4: I/O Termin

Pagina 4

Contact DetailsFurther information on the installation and operation of the TVI C300 Encoder isavailable online at http://support.essential-viewing.co

Pagina 5

Installation GuideThank you for purchasing your new TVI C300 Encoder.The package you have received contains everything you need to set up an infrastru

Pagina 6

Installing the TVI EncoderThe TVI Encoder has been designed to be used in indoor environments (or outdoor when located ina suitable housing) and has f

Pagina 7

Step 1: USB PenInsert the USB Pen Drive into a spare USB socket on a PC running MS Windows XP/Vista.Depending on your computer's configuration Wi

Pagina 8 - Boot Process

Step 4: Encoder Name and Server AddressStep 5: Encryption and Authentication Standard LAN (RJ45) Connection The Encoder will connect to any network

Pagina 9

Step 6: Encoder Time ZoneStep 7: VPN Configuration Select the Time Zone on the Encoder correctly sothat the video playback time displayed in thev

Pagina 10 - Network Encoder Connectors

Step 8: Network Configuration (LAN only)Step 9: Mobile Network Configuration (3G only)The predefined settings are correct as of January 2009 and may b

Pagina 11 - RS485/422

Step 10: Eject Pen DriveOnce the appropriate settings have been entered hit the ‘Finish’ button to close the wizard. Followthe given instructions on

Pagina 12 - Contact Details

Once all three phases are complete the Encoder should show three solid green lights. This signifiesthat the Encoder is now connected to its Network Se

Commenti su questo manuale

Nessun commento